The Right Exhaust housing of our Turbine engine is assembled in Stage 20!
Category Archives: BUILD
Stage 19
We connect the Fan Wiring and begin construction of the Turbine engine of our K.I.T.T. during Stage 19!
Stage 18
We complete the Radiator assembly and install it into the Chassis with Stage 18!
Stage 17
Work begins on the Radiator assembly by preparing the Fan Surround in Stage 17!
Stage 16
Stage 16 has us build the Front Right Wheel and attach it to our Chassis!
Stage 15
Our Front Right Wheel Arch is assembled and installed on the Chassis with Stage 15!
Stage 14
With the Front Left Wheel Arch now installed, we can begin working on the Front Right Wheel Arch during Stage 14!
Stage 13
Additional details are added to the Front Left Wheel Arch, then we install it on the Chassis in Stage 13!
Stage 12
We attach some details to our Front Left Wheel Arch during Stage 12!
Stage 11
The large metal Chassis Center Section arrives with Stage 11 of our 1:8 scale Knight Rider K.I.T.T. build!