A pair of Chassis Beams, the spare tire wheel well, and an Axle Bar are added to our Chassis as we complete Stage 30!
Category Archives: BUILD
Stage 29
The engine assembly is installed and we extend the Chassis to its full length during Stage 29!
Stage 28
The Gearbox and a bunch of hoses/cables are installed with Stage 28 – this one is going to be tricky!
Stage 27
In Stage 27, we build the Compressor Chamber assembly at the front of the Turbine engine!
Stage 26
The Air Intake system is finished and connected to our Turbine engine in Stage 26!
Stage 25
One of the Intake Ducts is attached to our Air Intake Duct as we complete Stage 25!
Stage 24
We begin construction of our Turbine Air Intake system during Stage 24!
Stage 23
In Stage 23, we close up the Turbine engine housing with the bottom and back panels!
Stage 22
We wrap up this build session by attaching the Exhaust assemblies to our Turbine Top with Stage 22!
Stage 21
The Left Exhaust housing of our Turbine engine is built as we complete Stage 21!