A pair of Chassis Beams, the spare tire wheel well, and an Axle Bar are added to our Chassis as we complete Stage 30!
All posts by MarvelPhx
Stage 29
The engine assembly is installed and we extend the Chassis to its full length during Stage 29!
Stage 28
The Gearbox and a bunch of hoses/cables are installed with Stage 28 – this one is going to be tricky!
Stage 27
In Stage 27, we build the Compressor Chamber assembly at the front of the Turbine engine!
Stage 26
The Air Intake system is finished and connected to our Turbine engine in Stage 26!
Stage 25
One of the Intake Ducts is attached to our Air Intake Duct as we complete Stage 25!
Stage 24
We begin construction of our Turbine Air Intake system during Stage 24!
Stage 23
In Stage 23, we close up the Turbine engine housing with the bottom and back panels!
Free Gift #2
The subscription-based version of this Fanhome 1:8 scale Knight Rider K.I.T.T. partwork build-up includes five FREE gifts along the way. The first gift of these gifts was some Posters. For our second gift, we received this replica ‘KNIGHT’ License Plate.
I have to be honest here and say that I am disappointed in this plate – it is really nothing like the plate found on K.I.T.T.. It is not full size, it does not have the state name ‘CALIFORNIA’, nor does it have any registration tabs.
If you do want a better license plate for your K.I.T.T. display, I did a quick search on Amazon and found we can have a much more accurate license plate for less than $20. Not only is it full-size stamped metal, it has the accurate markings and even the registration tab stickers:
Stage 22
We wrap up this build session by attaching the Exhaust assemblies to our Turbine Top with Stage 22!