We wrap up this build session by attaching the Exhaust assemblies to our Turbine Top with Stage 22!
Monthly Archives: December 2022
Stage 21
The Left Exhaust housing of our Turbine engine is built as we complete Stage 21!
Stage 20
The Right Exhaust housing of our Turbine engine is assembled in Stage 20!
Stage 19
We connect the Fan Wiring and begin construction of the Turbine engine of our K.I.T.T. during Stage 19!
Stage 18
We complete the Radiator assembly and install it into the Chassis with Stage 18!
Stage 17
Work begins on the Radiator assembly by preparing the Fan Surround in Stage 17!
Stage 16
Stage 16 has us build the Front Right Wheel and attach it to our Chassis!
Stage 15
Our Front Right Wheel Arch is assembled and installed on the Chassis with Stage 15!